Marriot London Kensingtion – Residence In

Appointed by Willmott Dixon, eBrit Fire Protection took on fire stopping of an existing building in Earls Court London.
Spread over 10 floors construction was to become an all-suite apartment hotel - Residence In by Marriot London Kensingtion.
Due to project size, sheer amount of seals required to fully fire stop the building meant our team of highly trained fire stoppers had to work continuously for period of 18 months. From fire spraying of new steal in the basement to sealing thresholds on the 10th floor work was carried out to the highest standard and despite few minor installation problems, fire stopping of the building was delivered on time.

Client: WILLMOTT DIXON
Duration: 18 months
Contract value: £325,000
FIRE STOPPING